top of page

Testing the Parts

Feb 8, 2017
1 min read

Today, the loom was supposed to finally be put together. On one of the last Eden Eve days, Ian and I spent around an hour attempting to put the parts of the loom on the base-plate. The Sunday before, in order to make the loom able to be easily stored, the base-plate was cut into three pieces which fit together. The top of the rail was hot glued to the sides, and everything was lined up and marked on the base-plate. Before gluing could begin, however, we realized that the moving wall was slightly too long and wouldn't fit on the base-plate. Everything else seemed to line up nicely. By next week, the piece will be cut, and hopefully everything can be screwed down.

  • Laying Out Pieces
  • Assembling Walls
  • Testing Rail System


 
 
 

Comments


Featured Posts
Recent Posts
Archive
Search By Tags
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square

2017 by Kyle Fertig. Project by MZUMC Youth.

bottom of page